Last month SIF worked with members in Uist to respond to the OFGEM draft determination for ED2 to appeal the draft decision which has rejected the replacement of the Skye-Uist subsea cable, despite the high risk of failure before the end of the ED2 period (2023-2028). You can read our submission here.